How to Use A Concrete Pump Trailer On Construction Site

The construction process of the mixing towable pump is followed by installation, piping arrangement, test machine (inspection), forklift feeding, material loading, mixer mixing, concrete delivery to the designated position for construction,construction completion operation.

1.Set a stirring towable pump on the construction site
When placing the pump on site, it must be set on a firm and level ground, without slopes and potholes. Around the site, it should be ensured that there is sufficient water source and reliable power supply.

2.Piping arrangement
The pipeline for conveying concrete should be implemented in accordance with the equipment operation manual and the good conditions of the site. Minimize bends and lay them on the principle of the shortest distance and the smallest bends.

It is necessary to ensure that the pipe clamps at the joints of each pipeline are firm, with good sealing performance and no leakage of slurry. The horizontal pipelines should be erected with support points, and the vertically upward pipelines should be reinforced with fixed points to avoid shaking and loosening of the mixing pump when pumping is on.

3.Test machine (check)
Inspection is an important item in each construction. Don’t think it is very cumbersome. Checking various conditions of the pump is beneficial to the construction. The pump can avoid some failures and discover hidden dangers in advance. Idling the pump and pumping water or pumping mortar to make the dual purpose of checking and wetting the pipes.

4.Forklift feeding
Mix the sand, stones, cement etc. according to the proportion required by the national standard. Generally, there is one forklift stone, one forklift sand, and two bags of cement ( the cement is done manually or by the cement hanger of the machine itself). The truck puts concrete into the hopper.

5.Mixing
The concrete material is put into the mixer by remote control lifting hopper, and the mixer automaticallly mixes and adds water(the timer for adding water can be adjusted in advance, and it can be modified according to the condition of the concrete material. In general, the pump has been set the initial value before leaving the factory.), the concrete is mixed for the first time, and the mixed concrete is uniform and of good quality.

6.Conveying concrete to the designated location for construction
The mixer sends the mixed concrete into the hopper of the pump machine through the discharge door (remote control) of the mixer, and then the concrete is mixed for the second time by the pump, and then the concrete is pumped to the pouring point.

7.Construction completion operation
After the construction is completed, some steps need to be completed, an important aspect of reducing pipeline blockage. After working, it is necessary to pump the mortar once to letout the stones in the concrete conveying pipe, and then open the pipe with a cleaning ball to clean the pipe and flush the pump.

Categories
Concrete Pumps My Blog

What Need to Do To Keep A Concrete Mixer Truck With Pump

During the use and storage of the truck installed concrete blending pump, due to the wear, all-natural corrosion and also aging of the components, the performance will gradually decline over time. So, it must be maintained and also fixed in time.


The function of vehicle-mounted mixing pump maintenance is to bring back the normal state of the vehicle-mounted concrete mixing pump, keep great performance and dependability, and extend its service life. Let’s have a look at the maintenance approaches of the truck-mounted blending pump.

truck mounted concrete mixing pump

Truck-mounted Concrete Mixing Pump Upkeep

  • Cleaning up

The vehicle is spick-and-span. The engine as well as its setting up elements as well as on-board devices are devoid of dust. The filters remain in typical use. The hydraulic oil and engine oil are without pollution, and the pipelines are unhampered.

  • Examine

The engine as well as different assemblies and also components are in regular station. The parts are complete and also reputable, and the connections and also fasteners are intact.

  • Fastening

All fasteners have to be complete without damage, mounted firmly, as well as the level of tightening up fulfills the needs.

  • Adjustment

Accustomed to the technological requirements for adjustment of each component, as well as make changes thoroughly and meticulously according to the change approaches and steps.

  • Lubrication

According to various areas as well as seasons, the sort of lubricating substance need to be chosen properly. The oil and also tools to be loaded ought to be clean. The filling up port and also nozzle must be wiped clean, and also the filling up quantity must meet the requirements.

truck mounted concrete pump

Maintenance of truck-mounted mixing pump

  • Upkeep of The Chassis Component

The evaluation of the chassis mostly consists of the inspection of oil and also water, the evaluation of clutch, transmission and also tire.

  • Upkeep of Transfer Situation as Well as Rotating Reducer

Apply oil to the surface area of the pinion linking the slewing decrease system and also the slewing bearing regularly for 3 months, and also consistently load the slewing bearing with grease through the oiling nipple on the oiling seat with an oil weapon.

  • Maintenance of Pumping Devices

After the tools has pumped about 5000m ³ of concrete, you should pay attention to inspect the gap between the glasses plate and the reducing ring. If it goes beyond 2mm as well as the wear is uniform, you need to think about changing the space.

  • Maintenance of Hydraulic System

Cleaning up is a fundamental part of hydraulic system maintenance. Constant cleaning is called for to maintain the system devoid of dust, dirt and also various other bits. Inspect the hydraulic hose pipes and joints for oil leakage. If they are harmed, the hydraulic pipes have to be changed.